Thursday 14 April 2016

Still waiting for Land Registration

Hey guys, just a quick update, the Land is still yet to be finished & registered, originally it was February then April, now its May or June, its looking a lot closer now though, streets are done, footpath looks completed (well on one side at this stage)
Few little issues, one being the surveyor has already been to site and the drawings have been done, now that's quick... buuuuut, slight hiccup... the land isn't ready yet, we are supposed to have retaining walls on either side and at the rear of the property, so the contours are done as the land is now not how it will be, which gave us a nice little variation cost for too much slope on the bloke,
I am sorting this out asap and when this is out of the way everything should be going smoothly, at least with the need to redraw our plans I can really go through them with a fine toothed comb to ensure everything is great, already changed a few things, just little things.... like door swing directions, adding a few extra Doors/Cavity Sliding Door, resizing a few things, all the fun stuff, lol

Here is our block as is now, just sitting here sounds amazing, the bell birds chirping away, love it...